Building a Datacenter for Manufacturing Growth
One of the major manufacturing companies was running its operations on a 15-year-old data center and outdated IT systems. An upgrade was required to enhance their performance and reduce their cost through future scaling—but downtime was not an option. Orbit Techsol built a new data center adjacent to the existing facility and updated the company’s IT systems to facilitate zero-downtime migrations.
Zero Impact
On live
production systems
15-Year
Legacy eliminated
in a single phase
5000 sq ft
DC built in
just 6 months
Client Background
The client is a large manufacturing enterprise dependent on continuous IT availability for production and business operations. While the business was expanding, its data center and IT systems had reached end-of-life, resulting in performance limitations, higher costs, and increased operational risk.
The Challenge
-
15-year-old data center with outdated power, cooling, and civil infrastructure
-
10–12-year-old IT equipment affecting application performance
-
Structural limitations preventing in-place modernization
- High operational costs and low energy efficiency
-
Critical requirement to maintain uptime during migration
Table of Contents
The Solution
data center in just 6 months.
electrical, smart racks, and passive infrastructure.
space and monitoring.
compute, and Commvault backup.

The Result
Zero Downtime, Maximum Growth
Orbit helped the client transition from an aging data center to a modern, scalable infrastructure without disrupting day-to-day operations. The entire build and migration were completed in just six months, achieving a 100% infrastructure refresh while ensuring uninterrupted business continuity.